Monday, April 18, 2016

manufacturing resource planning ii


Manufacturing Resource Planning ii


MRP II or Manufacturing Resource Planning by itself is the original modality of what we know now as ERP, and covered materials planning. This is part of eresource's ERP solution. MRP II is one of the evolution stages of eresource ERP and covers all the resources in a manufacturing company, with the additional ability to manage "what if" situations.

MRP II module in eresource ERP helps to maintain a neat agenda for the manner in which the resources are to be allocated without any confusion.

The interacting functions considered for this model are: Commercial Planning, Sales, Master Production Scheduling, Materials Resource Planning (MRP) and support systems for Capacity and Materials Execution.

There is a scheduling capability within the heart of the solution that concentrates on the resources, such as the plant and equipment required to convert the raw materials into finished goods. The advantages of this development are that detailed plans can be put to the shop floor and can be reported on by operation, which offers much tighter control over the plant.


CONTACT US
MUMBAI
TMA House, 1st Floor,Road No 16, Plot No. 6,Wagle Industrial Estate,Thane (West) 400 604, Maharashtra Tel: +91 22 41118000 / 8049 (50 lines),   +91 22 25828775


UAE
eresource MiddleEast FZE,P.O Box: 513071, Sharjah, United Arab Emirates ,Contact Person: Sudheer Soman Nair, CEO,
Mob: 00 97155 9018499
email: sudheer.nair@eresourceinfotech.com
http://ow.ly/4mNZNO
OMAN
eresource,P.O BOX No 1046, PC-130, CPO,Al-Azaiba, Muscat, Oman
Tel + 968 2 459 7226/7/8  Mob: + 968 90157499 Contact Mr. Sudheer Nair / Mr. R. Ramesh
email: sudheer.nair@eresourceinfotech.com
www.eresourceerp.com






   

Master Production Schedule


















Master Production Schedule


Eresource ERP Master Production Scheduling System considers all significant demands and replenishment thatare identified for production, and translates those demands into a supply demand schedule for manufacturing.

Eresource ERP Master Production Scheduling system is used in conjunction with Material Requirements Planning (MRP) to schedule finished goods production and raw materials requirements when and where they are required.

Simply put it, Eresource ERP Master Production Scheduling system translates a business plan with fore casted demand (sales orders) into a workable production plan (supply orders). A typical production plan would consist of planned orders in a multi-level (Bill of Material - BOM) scheduling environment.

Eresource ERP Master Production Scheduling system quickly and accurately schedules all item requirements for each manufacturing facility.

Some of the benefits of using Master Production Schedule module are it helps last minute scheduling, shortage avoidance, efficient allocations of resources and cost control. It gives the customer timely information on what they need and when they need. Eresource ERP's MPS module organizes what the customer need to do and when efficiently. The schedule can be re-calculated easily when a process fails, for example, the situations like a material shortage or manpower absence.



for more information visit   www.eresourceerp.com




contact us 


TMA House, 1st Floor,Road No 16, Plot No. 6, Wagle Industrial Estate,Thane (West) 400 604, Maharashtra, Tel:  +91 22 41118000 / 8049 (50 lines) 
e-mail (Sales): sales@eresourceerp.com